If your new build in Clonburris, Adamstown or anywhere else in Dublin isn’t ready on time, the usual fix is to put your furniture into short-term storage, find somewhere to stay for the gap, and move straight from the storage unit into the new house once you have the keys. Stow Self Storage is a few minutes from Clonburris and a short drive from Adamstown, with same-day move-in and rolling terms, so you can hold your things for as long as the delay lasts without signing up for months you don’t need.
Buying a new home should be exciting. But if you’ve bought off the plans, you’ll know the “expected completion date” can be more of a hope than a promise. Here’s what to do when the date slips, and how to stop a delay from turning into a full-blown crisis.
Why do new-build closing dates get delayed?
Delays happen on developments of all sizes, and they’re rarely anyone’s single fault. Common causes include:
- Construction running behind, because of weather, supply problems or labour shortages.
- Utility connections. A house can look finished but still be waiting for its electricity, water or broadband connections to go live.
- Roads, footpaths and lighting in the estate needing to be completed before homes can be handed over.
- Paperwork. Certificates of compliance, snag lists, and the legal back-and-forth between solicitors all take time.
- Mortgage drawdown timing, particularly if your loan approval needs renewing because the original date passed.
How long do new-build closings get delayed?
There’s no single answer, and anyone who tells you otherwise is guessing. Some buyers wait an extra week or two; others find the date moving back by several months, a bit at a time. In our experience, the most stressful delays aren’t the long ones, they’re the ones that keep moving. A “two-week delay” that becomes four, then eight, is much harder to plan around than a firm new date.
The safest approach is to plan for the gap to be longer than you’re told, and pick storage and accommodation that can stretch without penalties.
What do I do with my furniture if my new house isn’t ready?
Here’s a step-by-step plan that works for most people.
1. Talk to your solicitor and the developer
Ask for the most realistic revised date, in writing if possible, and what your contract says about delays. Your solicitor can tell you what you’re entitled to. Don’t hand back your current keys or sign anything on your existing home until you understand where you stand.
2. Work out where you’ll stay
Family, a short-term let, or an extension on your current tenancy if your landlord agrees. Whatever you choose, your full household probably won’t fit there, which is where storage comes in.
3. Book a storage unit with flexible terms
Look for no long lock-in, no setup fees, and access when you need it. At Stow, the minimum rental is 12 weeks, after which it rolls every 4 weeks, so if the keys arrive sooner or later than expected, you’re covered either way. New customers get their first 4 weeks for €1.
4. Pack for two moves, not one
Think of it as a move into storage and then a move into the new house. Pack a “life box” of the things you’ll need for the gap, and make sure everything going into storage is labelled for the room it will end up in at the new house. That way the final move is quick.
5. Move in, then wait it out
Load the unit with big furniture at the back and the boxes you’ll want first at the front. Then, when the keys finally arrive, it’s one trip from the unit to your new front door.

Bought in Clonburris? Storage on your doorstep
Clonburris is one of the biggest new-home developments in Dublin, sitting between Clondalkin and Lucan along the Kildare railway line. Stow is about five to ten minutes away by car, which is handy in two ways. During a delay, you’re storing your things close to where you’re going to live. And once you’ve moved in, it’s an easy place to keep the bikes, camping gear and boxes that won’t fit in a new home with a small attic and no garage.
For more on the local area, see our guide to self storage in Clondalkin and Dublin 22.
Bought in Adamstown? A short hop to Clondalkin
Adamstown, beside Lucan, is another large planned community with new homes still coming on stream. From Adamstown it’s roughly 10 to 15 minutes to Stow via the Outer Ring Road, outside rush hour. If you’re coming from Lucan generally, our Lucan, Palmerstown and Ballyfermot guide has more on getting here.
What size storage unit do I need for a house move?
- One-bed apartment: usually a medium unit.
- Two- or three-bed house: usually a large unit.
- Larger family home: an extra-large unit, or two units if you want to keep things separate.
Use our storage calculator to get a recommendation based on what you own, or read our guide to what actually fits in a storage unit.
Tips to make a delayed move less painful
- Don’t cancel your van or movers until the date is firm. Ask whether they can do two jobs: into storage now, out of storage later.
- Keep important paperwork with you, not in the unit: passports, mortgage documents, your contract and anything your solicitor might ask for.
- Protect new-home items. If you’ve already bought furniture or appliances for the new house, they can go straight into storage when delivered, rather than cluttering up your temporary place.
- Keep everything dry. If you’re storing for a few months, make sure everything is clean and dry before it goes in. Our guide to keeping damp and mould away from stored furniture has more.
- Use the wait to declutter. Moving twice is a great incentive to leave behind things you don’t need in your new home.
Frequently asked questions
What do I do with my furniture if my new house isn’t ready?
Put it into a short-term storage unit with flexible terms, stay with family or in a short-term let, and move everything straight into the new house once you get the keys.
How long do new-build closings get delayed?
Anything from a couple of weeks to several months. Delays often happen in stages, so it’s sensible to plan for a longer gap than you’re first told.
Is there storage near Clonburris?
Yes. Stow Self Storage on Ninth Lock Road, Clondalkin, is about five to ten minutes from Clonburris by car.
Is there storage near Adamstown?
Stow in Clondalkin is roughly 10 to 15 minutes from Adamstown via the Outer Ring Road, outside peak times.
Can I move my things in on the day I leave my old place?
Yes. You can book online and move in the same day, as long as you have a smartphone and a copy of your ID.
Keys delayed? We’ll hold the rest
A late closing date is frustrating, but it doesn’t have to wreck your plans. View available units and get an instant quote, call 01 966 0992 or email hello@stow.ie. New customers get their first 4 weeks for €1.